I am on shift today, here in building 5 (the SLAC accelerator main control center, or MCC). I am filling the shift position referred to as “liaison”, and my job is to make sure that the experiment (Babar) know’s what the accelerator (LINAC and PEP) is doing, and vice versa. […]